The Bell That Cost a Ferry Landing
Page 186 of 284
Chapters
At the bottom of his book he drew the diversion again, then crossed it out. The new line would not be a broad rerouting through gardens. If the old masonry could be exposed and judged sound, the commission might rebuild only its damaged crown and fit a controllable gate at the outlet. That would be cheaper, more compact, and less destructive. It would also be indefensible if the arch proved rotten or the passage ended in collapsed rubble.
A plan could not make sound stone out of bad stone. He needed the landing cleared to inspect what lay beneath it.
At the commission office, the map spread across a scarred table beneath a green-shaded lamp. Varneck had left his chair empty while he inspected the embankment works upstream. His clerk had provided the latest accounts: wages for the plug, cartage for clay, and the loss entered against Peregrine’s completion bonus. Peregrine laid his field book beside the map and weighed the brass dividers in his hand.
The diversion crossed the garden plot in a clean red line. The culvert route was still a dotted guess, drawn from the old ferry stairs, the ditch, and the exposed joint Peregrine had traced to the landing. The dotted line looked flimsy on paper. Yet it represented a possible outlet already carrying water, while the red line represented certain damage and certain cost.
He set the dividers at the scale and measured the proposed ditch again. Then he moved the point to the cottages. Two gardens, two boundaries, a new channel, a retaining wall where the ground dipped. The figures agreed with his first estimate. He added the likely compensation and recalculated the labor. The total climbed beyond the allowance Varneck had said was left for drainage works.
The clerk glanced over. “If you put in the gate, sir, they will ask what masonry you have found.”
“I have found none. Not yet.”
“Then they may ask why you have priced it.”
“Because the alternative can be priced now.”
He could hear his own impatience and checked it. The clerk was not obstructing him; he was pointing out the weakness in a recommendation that depended on a structure still hidden beneath another person’s landing. Peregrine turned the map so the route faced him squarely. The margin was narrow. There was little room for a conditional scheme, and no space at all for the consequences of guessing wrong.
He wrote a new heading: gated outlet at existing culvert, subject to exposure and inspection of arch. Under it he listed excavation of landing, temporary support, replacement of failed crown stone if required, iron flap and accessible operating lever. He left the masonry estimate blank.