The Bell That Cost a Ferry Landing
Page 187 of 284
Chapters
The blank annoyed him more than a wrong number would have. A number invited approval; a blank advertised uncertainty. But any figure he entered before inspection would be a fiction with tidy columns. He drew a line through the blank and wrote: estimate to be confirmed upon exposure; no permanent works authorized until masonry examined.
Then he went through the figures once more. The gated outlet required skilled masons and a short interruption to the landing. It might require a new flap and ironwork, but it used the existing route. Even with a generous allowance for repair, it cost less than digging a channel through the gardens and compensating the tenants. It would also leave the cottage ditch draining by a route whose behavior could be watched and tested, rather than a new cut whose performance existed only in a drawing.
There was a practical advantage beyond the arithmetic. The flap could be set to prevent the tide forcing water inland, while allowing the ditch to empty on the ebb. But no mechanism would help if the old passage pinched shut or if the stone arch had settled. He marked the gate’s position on the plan and drew an access path beside the cottage boundary. A lever placed on commission ground, away from private rooms, could be inspected by the tenants as well as the engineers.
He remembered Nell’s question: assessed by whom? If the cottages were to live with the outlet, its working could not be confined to an office schedule. A gate that no one below the bank could see might be maintained according to a timetable convenient to the commission and useless to a flooded washhouse. He added a note: operating lever to remain accessible from cottage path; tenants to be able to report obstruction or failure.
The addition made the design more defensible, not less. It also meant the tenants’ access had to be shown on the works drawing. Peregrine took a clean sheet, ruled a narrow path beside the cottages, and marked the outlet where the old ditch met the bank. The line was tentative, but it gave the people whose gardens he had measured a place in the scheme beyond the column for compensation.
Varneck returned near dusk, carrying mud on the edge of one boot. He stood at the table and read the heading without taking off his gloves. His small hands rested on the map’s borders, keeping the paper flat.
“You have abandoned the diversion?”
“I have set it aside unless the culvert fails inspection.”
“You cannot inspect what you have not exposed.”
“No, sir. The landing must be opened to reach the crown.”