The Bell That Cost a Ferry Landing
Page 235 of 284
Chapters
He fetched a lantern from the survey chest. Even in daylight the opening was black beyond the first few feet, and the flame made the wet stones shine. Peregrine tested the sill with the iron point of his staff. It rang dull and solid. He leaned close without putting his head beneath the arch. The air smelled of mud, old leaves, and the sour mineral scent of water shut in stone.
“There is a crack at the crown,” Varneck said.
“There is a line,” Peregrine replied. “It may be a joint, or a crack. I will not name it until the clay is cleared.”
“Then clear it.”
“Not by sending a man under unsupported earth.” Peregrine straightened. “We shore the face first. We dig back from the bank in stages. The crown stone is lifted only after the load is taken. If the abutments are sound, we can rebuild the short section and fit a gated outlet. If they are not, the design changes.”
Varneck’s mouth tightened beneath his long upper lip. “You are proposing works beyond the order.”
“The order says to close the uncharted passage. The trial has shown that closure raises the cottage ditch. The opening is under our embankment and carries water. It cannot be responsibly filled until we know what it carries and how it is supported.”
The words were in his official manner, but he could hear what he had not said: his earlier drawing had marked solid ground there. The commissioners had given him the field. He had accepted the line as certain because it made the plan neat. A culvert might have been omitted from the record long before his appointment, but he had certified a survey that did not find it.
Rosamund watched him, her hands closed around the mud on her palms. She did not ask whether her landing could be restored. Its boards lay in a stack, and the stone mouth where they had stood was plain to every observer. Whatever lease the commissioners granted, it would not be for this berth as she had built it. She had put her savings into planks that now belonged to no usable crossing.
Peregrine’s lantern flame leaned in a draft from the culvert. A leaf clung to the sill, trembled, and slid out over the mud. He marked the direction on his page. Flow was proven; strength was not. He wrote: expose crown under temporary support; retain outlet pending inspection; estimate gated passage. Then, after a pause, he added his initials beneath it. The small letters looked no larger than the gravel grains scattered over the paper.