“The scope requires a safe corridor.” Verramont shut the chamber door and turned the key. “If you want to contest the map, contest it. But don’t mistake a line on a survey for protection from water.”

Maren thought of Yale’s elevation sheets. The shop floor sat above the lake’s operating maximum. That fact could defeat the claim that the lake already covered her building, but it did not stop runoff from gathering behind the causeway. The county had used the wrong water to justify the wrong boundary. It had not invented the blocked drain.

“The houses are in danger,” she said.

“Yes.”

His answer caught her off guard. She had expected him to retreat into the map. Instead, he met her eyes. “That’s why I’m here. The hazard is real. The project is the available response.”

“Available because it has money attached to it.”

“Available because it can be funded.”

They stepped back into the flat daylight. Across the road, the lake remained low, its gray surface broken by a few wind-driven ripples. Maren looked from it to the hillside. Rain clouds pressed against the upper slope, though no rain had begun. Between those two waters lay the street, lower than the alley and cut off from its designed outlet by a clogged throat of weeds and silt.

The county had not made the water harmless by labeling the buildings vacant. But it could make the residents disappear from the project’s arithmetic. If the street was cleared, the water could take it without becoming anyone’s emergency.

Verramont led her to a metal cabinet mounted beneath the maintenance shelter. Its door had a faded diagram of the causeway, the drain, and the spill route. Someone had drawn a red line from the uphill alley toward the low parcels. The route crossed the shop, the row of houses, and the steps leading to the annex.

“That’s the alignment?” Maren asked.

“The proposed corridor. It follows the existing low grade.”

“It follows the occupied buildings.”

“The buildings are on the low grade.”

She stared at the diagram. The county map’s broad blue shading had made the whole street look submerged. This red line was narrower and more honest: a route water might take if the drain stayed blocked. It also showed precisely why the county needed the street empty for its grant.

“Could the outlet be cleared?”

“It could be cleared temporarily. That would improve capacity. It would not restore the original design, and it would not meet the grant’s long-term safety requirement.”

“Could you do both?”

“Not with the present appropriation.”

“Could you do the drain first and apply for more money?”