The Bell That Cost a Ferry Landing
Page 190 of 284
Chapters
“That the board authorize exposure and inspection before authorizing a permanent diversion or infill. If the arch and abutments are sound enough to repair, a gated outlet is the cheaper and less damaging course. If they are not, the diversion remains available.”
“And Trennick’s landing?”
“It cannot remain intact during exposure. The bearing must be uncovered. Some or all of the planks will have to be lifted.”
No one spoke for a moment. The red line passed through neat rectangular gardens; the dotted line cut beneath the landing that Rosamund had built with the savings meant to win her lease. On paper, both routes were narrow. In the world outside the meeting room, neither was.
The board did not vote to build the gate. It voted to defer permanent infill until the culvert could be exposed and inspected, and to prepare a short reconstruction if the stone proved adequate. The decision required Varneck’s signature and a separate authorization for the work at Rosamund’s landing. The diversion plan stayed on the table as the fallback. Its price, with the gardens included, had made the room attentive.
Peregrine took the signed minute to the office and entered the decision in the works register. Under ‘authority,’ he wrote: expose existing masonry for inspection; no permanent closure pending report. He added that access to the cottage path must be maintained. The clerk sanded the page, then closed the book with a soft thump.
Outside, the day had cleared. Peregrine walked back to Fenwick Reach by the high road, carrying the plan case. Across the river, the market road climbed toward the coaching inn; below him, the water moved against the embankment in long slate folds. The cottages lay behind it, their roofs and chimneys visible over the bank. The landing showed as a dark interruption in the pale line of the new works.
At the ditch, Nell had set two wooden sticks beside the path, each notched with a water mark. One stood by her washhouse wall; the other, farther down, marked a different cottage threshold. She watched him approach but did not move the sticks aside.
“The board has deferred the infill,” he said. “They will expose the masonry and inspect it. If it can be repaired, they will consider a gated outlet. If it cannot, they may still choose the diversion.”
“And the gardens?”
“They would be taken only if the culvert fails or cannot serve.”
Nell looked toward the landing. “So first they take the planks.”
“Yes.”