The Lake Has Office Hours
Page 255 of 276
Chapters
Maren looked down at the signature line. It did not ask whether she was ready. It asked whether she agreed to convey.
The first attachment was the appraisal. Maren read it slowly, not because she expected the numbers to change, but because each line represented a claim the county would later say it had made carefully. The shop’s square footage was right. The construction date was not. The report called the cellar “inaccessible,” the rear wall “structurally compromised,” and the business “discontinued following flood event.”
“That last phrase,” Maren said. “It makes it sound like I stopped working before the water came.”
Harlan leaned over to see. “The appraiser’s description reflects the condition on inspection.”
“I was still repairing clocks when he came.”
“The supplemental statement can clarify that.” Verramont’s voice was smooth with the effort of making impatience sound like reason. “We have never disputed that you operated there.”
“Your map disputed the building existed.”
He pressed his lips together. “The title correction is part of this settlement.”
Maren turned to the next page. An exhibit showed the new drainage bypass in clean black lines. Its inlet occupied the footprint of her shop, a squared mouth meant to receive runoff from the uphill alley and carry it beneath the causeway. The drawing did not show the cracked bench, the wall where she had hung her tools, or the window through which afternoon light used to find the dust. It showed a channel and a flow arrow.
At the far end of the drawing, the line curved away from the occupied parcels. The engineer’s revised plan protected the uphill buildings without cutting through them. The bypass would take the floodwater by a route that should have been used before anyone had posted demolition notices on doors.
“There’s a condition on the payment,” Maren said. “The county has to build the bypass to this drawing, not to a later value-engineered substitute.”
“The funding amendment requires the approved design,” Harlan said. “Any material alteration would trigger review.”
“Review by whom?”
“The district engineer and the funding authority.”
“And if the county decides it’s too expensive after I sign?”
Verramont pulled out the chair opposite her and sat. His knees showed beneath his fitted trousers, slender under the barrel chest. “The project is funded. We’ve redirected local matching funds. There is no plan to abandon it.”
“There was no plan to admit the street was occupied, either.”
His face tightened under its roundness. “That is why the roster is being corrected.”