The Lake Has Office Hours
Page 232 of 276
Chapters
Verramont met them on the courthouse porch. Rain speckled his coat and darkened the stone steps. “The county will comply with the stay,” he said. “The evacuation boundary remains in effect. No one should interpret today’s order as permission to re-enter.”
“We won’t,” Maren said.
“The judge has directed a comparison. That takes time.”
“Then the county can start comparing.”
His underbite showed as he pressed his lips together. “The corridor was selected because the drain failed and the project needs a place to carry the water. The street has been exposed to repeated risk.”
“And the buildings were called vacant,” Inez said. “That was not a weather condition.”
Verramont’s gaze moved to her, then to the paper in Maren’s hand. “The occupancy record is under review.”
“The judge has our roster,” Maren said. “So do the clerks. You can stop calling it under review and start calling it occupied.”
Verramont stepped aside to let them pass. He did not withdraw the order, because it was already stayed. He did not offer a new deed, because that offer had been withdrawn. His control of the street had narrowed to the work he could still authorize and the forms he could still refuse.
At the foot of the steps, the county trucks remained in place. A crew member leaned on the barricade with both hands. Behind him, the road sloped toward the shop, where the lower windows were boarded and the rainwater had settled in the gutters. Maren could not see her workbench from the courthouse. She could picture the brass clock movements lined up in trays, each one waiting for a hand small enough to guide it back into motion.
Tamsin kept the copies of the stamped receipts in a separate folder. “They can’t say they never received them.”
“They can say they don’t prove who lived there,” Yale said.
“Then we prove that next,” Maren answered. “One thing at a time.”
Inez adjusted the tote on her shoulder. “And now we find out what the engineer can design.”
The judge’s order had made a new task for the county, and a new deadline for everyone who wanted the street to remain more than a red line on a plan. Maren folded the copy along its crease and slipped it beside the roster. They would stay evacuated. They would keep their addresses. The county would have to compare repair with removal before it sent the machines back.