What the Gauge Left Out
Page 51 of 259
Chapters
A visitor could look at the overlay and see a possibility. The panel, if it reopened the inquiry, would need to see the limits too. Fenna wrote that Orla’s interior photograph was not authorized for use, and that Siv had described only the water she observed at the rear passage and later in the lane.
She paused at the words “earliest marks.” They did not mean the first water. They meant the earliest witnessed locations she had so far. She added “known” before the phrase.
The revised sentence was less smooth, and more honest.
At the upper desk she opened the terminal file, which contained the public movement list and the few plans already gathered for the audit. They ended at the terminal’s outer wall. No tide reading, however exact, could tell her how water might have reached the lane from the covered approach. The readings answered height at the station, not route through the town.
She turned to the request forms attached to the station’s purchase papers. The cooperative was buying the tide station; the access easement and its construction records might be included in the transfer packet. She found the index but not the original sheets. A note directed inquiries to the terminal office.
Fenna wrote the request on the back of a copy, specifying original conversion sheets, access easement plans, and any completion records showing temporary barriers. She stopped before adding a theory. The reason for the request was enough: to test whether the terminal and lane were connected.
The sale deadline still sat at the top of her audit schedule. The plans might arrive too late to matter. She sent the request anyway.
She called Siv and asked whether the separate maps could remain separate if she requested terminal plans.