The Bell Beneath the Minutes
Page 130 of 242
Chapters

She returned to the kitchen and spread the plan over the table. She wrote to the buyer’s conveyancer, acknowledging the proposed reduction and requesting a marked deed plan before any change was accepted. She asked for the kitchen approach to be shown as a protected, step-accessible route outside the easement. She made no promise about the final price.
Then she opened her notebook to the first page of the day and copied the route’s dimensions as soon as Dace’s email arrived. The line ended just short of the back step. Una took a ruler and drew a separate box around the approach, leaving a strip of bare paper between the two.
The email arrived before the light failed. Dace had attached a draft alignment with the rear easement marked in grey and the kitchen access outlined in a thin line. In the note beneath it, she stressed that the drawing was for review only: the council solicitor, buyer and grant office all had to approve their respective parts. Una printed it and laid it beside the old annex.
The old document named the North Apron and the households entitled to first refusal. The new drawing showed how the defense scheme might leave that land available. Between them sat the price of the route: a permanent strip across Martin’s garden, a reduced sale amount, and no guarantee until the other parties agreed.
Una called Hugh again and offered to bring him the plan in the morning. He said he would look at it after his care appointment. He did not say it was fine. She did not ask him to.
She took a scarlet pencil from the kitchen drawer. On the draft deed plan—not the engineer’s original—she marked the step and wrote: access retained; confirm width and levels. Then she placed the pencil beside the document case and made a list of questions for the solicitor: maintenance, vehicle limits, hours of entry, repair costs, and whether the easement could be removed if the service alignment changed.
The rear strip was a specific sacrifice, not a solution. The plan might pass review, or fail on a technicality, a buyer’s objection, or the grant office’s assumptions. But she could now ask everyone to consider the same line on the ground, rather than an invisible route through someone else’s promised land.
Una signed the request for a marked deed plan and sent it before she could revise it into a safer question. Outside, the turning bay was empty. The kitchen step remained where it had always been, waiting to be measured properly.