bee2.io Books

Subtract Five Hours, Add Oyster Walls

Page 151 of 259

Chapters

“If we reduce the float by another section,” the officer said, “the allocation may cover the platform and moorings. The ramp might have to come from the maintenance reserve.”

“No,” Nessa said. “The ramp is not an extra. It’s the way aboard.”

“Then we can’t order it until the reserve is released.”

“Who releases it?”

“The same committee.”

Nessa planted her feet wider. “Put the full requirement in front of them. If they cannot fund the ramp, they cannot claim we have a landing.”

The officer held her gaze for a moment, then made a note. Nessa did not know whether the note meant agreement or only that her objection would be recorded. Both were better than a ramp disappearing between line items.

When the officer left, Sabine folded the revised drawing carefully. “You don’t leave much room for compromise.”

“I leave room for people. The equipment has to do the rest.”

“And if the money isn’t there?”

“Then the service waits.” Nessa folded her arms. “Better a waiting passenger than one on a ramp that can’t hold.”

Sabine’s long fingers rested on the map edge. “I used to think a mapped line was the first proof that a place could be reached.”

“A line can show where not to go.”

“It can.”

Outside, the tide lapped against the quay stones. The reserve boat was secured for the evening, its rope slackening in the current. Nessa listened to the water work against the hull, measuring a quiet that would not last. She took the salvaged fittings and covered them with a tarpaulin. Tomorrow they would begin pricing a smaller float. Tonight the old one remained where it was, bright blue and useless.

The board met again near closing time. Nessa sat at the end of the folding table, her red neckerchief loosened and her damp sleeves pushed to the elbows. The failed inspection report lay open beside Sabine’s drawing. The rust marks on its paper looked like little islands. The funding officer had placed the original allowance beside the updated cost, and the difference between them was a thin column of figures with no place to hide.

“We can afford a smaller new float if we use the recovered fittings,” the officer said. “The maintenance reserve can cover a purpose-built ramp, subject to approval. There will be no shelter on the platform and no spare section.”

“Can it carry the design load?” Nessa asked.

“Yes, within the specified conditions.”

“Can it be inspected before the trial?”

“Yes.”

“Can it be removed for repair without dismantling the whole landing?”

Analytics preferences

Allow Google Analytics to show us which books and story ideas readers open. That helps us decide what to publish first and make more stories readers enjoy.