All the Ears of Clay
Page 122 of 279
Chapters
Ressa set the first straight length against the chalk line. Miri fitted the bend. Ilo watched the direction of the return, checking the fall with his rod. The new ring went in without a shove. Its outer wall nearly brushed the boundary mark, but it did not cross it.
“That’s the margin,” Ilo said.
“There’s room to pack,” Miri answered. She slid a narrow strip of scrap clay around the collar. It went all the way around, snug and unbroken.
Ressa let out the breath she had been holding. “Then we can make the whole run.”
“The bend, yes,” Ilo said. “How many collars can you make?”
The question changed the room. Ressa looked at the chalked route. The run required more joints than she had first counted because the service strip had two shallow shifts, neither of which could safely be bridged by a long unsupported piece. She had accounted for pipe lengths. She had not counted every collar as a separate, carefully shaped piece of work.
Miri took the tally sheet from her pocket. She had already listed them. “For the full loop, including the return and the basin feed, we need this many.” She set her finger on the final mark.
Ressa counted. She counted again, though the figure did not change. The pipes could fit the route. The pieces required to connect them would take a full rack.
“How many tiles fit in that space?” Ressa asked.
Miri looked at the rack. It held the last roof order’s green pieces, waiting to dry. The ridge tiles lay in the center, their overlapping lips shaped to shed winter wind. The east-edge run stood upright along the wall. “All of them,” she said. “If we leave room for the collars to dry evenly.”
Ressa walked to the rack. The roof pieces were the end of a promise she had repeated at the bath, at Three Steps, and to Miri herself. Each tile had been shaped for a place in the roof. She could point to the courses that would cover the bath’s exposed partitions, protect the washhouse from wind, and make the opening she had spent months trying to deliver possible.
The pipes had another kind of claim. Without them the bath might not have dependable heat through winter. The alternative route ran under ground the town controlled, and the test had shown that warm brine could pass through a ceramic loop without touching the washwater. Still, the loop was not made. The roof was not made either.