A Place for the Knocking
Page 238 of 286
Chapters
Neri followed the brackets with her eyes. Beyond them, the gutter ran beneath a ridge where the slate dipped. She imagined the rain collecting there, filling the trough, striking the obstruction, and searching for a lower place to go. “If we clear the leaves now, it will still spill onto the arcade roof.”
“And if we unbend the downspout without replacing the lower run, it will come straight back toward the flat.” Zora spoke without hesitation. She had learned the system from Iven, even if neither of them had been willing to call it that. “No temporary fix.”
“No.” Neri pulled out her notebook and wrote it down. The rain made a smear of the first word, so she underlined it twice.
The first owner answered the door in a wool waistcoat and indoor slippers, though rainwater had already crept under the threshold. Mr. Dall kept his house keys on a ribbon around his neck. Neri explained the gutter and showed him the photographs she had taken from the roof. He listened, lips pinched, while Zora stood behind her with a folded plan of the roofline.
“That downspout is not mine,” he said when Neri finished. “The metal begins on the arcade property. I’ve had no trouble with my roof.”
“The water leaves your roof,” Neri said. “It crosses the arcade and backs up over the Wrenwick flat.”
“Then the arcade should repair it. I pay my rates.” He shut the door before Neri could ask which rate included a gutter that was not attached to his house.
Neri kept her hand raised for a moment after the latch clicked. The rain had found the seam above the door and was collecting in a shallow puddle on the step. Zora looked at it, then at the ribbon of keys visible through the narrow pane.
“He’ll say that puddle belongs to the street,” Zora said.
“And someone else will be expected to dry it.” Neri turned the photographs over and wrote the time and the owner’s answer on the back. A refusal was not evidence of a defective roof, but it was evidence of what had to be overcome.
At the arcade office, the caretaker directed them to the property agent, who was out until Monday. The office smelled of wet wool and carbon paper. A ledger showed the arcade’s repairs, all neat columns and stamped totals. Its most recent gutter entry read: diverted runoff, temporary. The charge had been paid six years earlier, but no one had recorded where the water was supposed to go afterward.