The Tide Skips a Beat
Page 37 of 285
Chapters
On the way out, she passed the board’s evening-run notice pinned beside the door. The board paid for that column. Pell had once called the money useful; today he had not looked at it. Miren thought of the blank margin of the old register, the space where the new door should have been, and set her jaw against the temptation to fill it with a guess.
She began with the notices. The board’s public counter occupied a narrow room beneath the water clock, where applicants queued between a slate wall and a row of brass hooks. Miren asked for the Needle Row allotment records, and the clerk brought out three years of printed summaries while keeping the bound ledgers behind his counter.
“Public totals are here,” he said. “Individual accounts aren’t.”
“I’m not asking for individual accounts.”
The clerk looked at her reporter’s pencil. “Then you won’t need the private book.”
She spread the summaries over the counter. Each listed the lower streets’ expected dusk intake, the reserve contribution, and the High Comb allocation. At first the columns seemed steady. Then she matched each date to the conversion permits filed in the city notices: lofts divided, old workrooms made into flats, new door ribs cut into walls.
The year Needle Row’s first conversions began, the lower allotment stayed level. High Comb’s increased. The next season, another cluster of conversions appeared in the permits. The lower figure held again; the upper one rose by a smaller amount.
Miren drew a vermilion line beneath the paired totals. “What changed in the reserve formula?”
“Nothing,” the clerk said too quickly. Then he glanced toward the back room. “Not that I’m authorized to say.”
“I’m asking what the printed formula says.”
He pushed the summaries closer. “The printed formula says the census leaf is the basis.”
She copied the figures. There was no order in them yet, only a pattern with one side held still and the other inching upward.
The counter clerk would not let her take the summaries, so she copied every line by hand. She checked the figures twice against the printed totals, then used the permit dates to arrange them in order. The conversions came in seasons, not one by one: whole stretches of old workshops divided into narrow flats, their entrances newly cut into the ribs of the street.
At first she thought she had found a dull explanation. The upper terraces required more stored water as the city grew; the lower totals had merely failed to keep pace. But the printed notices did not say that. They called the lower allotments “maintained” and the upper increases “necessary reserve adjustment.” One column had stopped moving, the other had not.