The Gauge That Measured Nothing
Page 138 of 164
Chapters
“Can the work start before the budget meeting?” Mara asked.
“You can request emergency funds,” Ruth said. “But the inspection and design still take time. A quick patch isn’t a substitute for knowing what’s sound.”
Mara nodded, once. The decision was visible in the angle of her shoulders. She had spent years pushing for the route to return, had called suppliers, argued for staffing, and secured the ferry itself. Now the opening had to become a closure notice, and the only way to protect the route was to say so plainly.
“We need to tell the people who were here,” Nell said.
“Yes,” Mara answered. “And we need to tell them where the ferry will run instead.”
The fishing pier had been a backup in their conversations, a possibility that always arrived with a list of difficulties. It was a certified work berth, not a ready passenger landing. At low water the approach steepened. The temporary gangway would have to be fitted and secured; the gear near the turning space moved; the fleet would have to agree to clear the area during sailing windows. Even if everyone agreed, the pier needed to be inspected for passenger use.
“How long?” Nell asked.
Mara turned over the calendar. “A week, if we can get the gangway, the cleared approach, and the agreements in place. Limited sailing windows at first. We’ll lose some departures while we make the setup safe.” She said it with the precision of someone counting cost rather than cushioning it. “If the inspection goes well, we can reopen service from there next week.”
Ruth raised a hand. “That’s a target, not approval. The pier setup gets inspected before passengers use it.”
“Understood,” Mara said.
Nell looked through the window toward the east fork. The fishing pier was farther along the boardwalk than the old landing, and the route to it passed the work sheds. The boats and their equipment were there already. A week was not a promise that nothing could go wrong. It was a date to work toward.
Mara called the town clerk, then the ferry crew, then the businesses that had arranged deliveries around the new route. Each call made her stand straighter, as if posture could keep the plan from sagging. She told each person the same essential things: the old landing would remain closed for the season, the connection needed full inspection and repair, and the ferry might resume from the fishing pier in a week if that arrangement passed review.