Rent Receipts Under the Spin Cycle
Page 151 of 178
Chapters
Mara looked at him. “We can make the dates specific where we can. Emergency heat failure: contact the contractor the same day and provide temporary heat or lodging while the system is down. For other repairs, acknowledge the request within two business days and give a schedule.”
“That I can do,” Bituin said. The repair reserve would have to remain real, not a line on a page. “And they can contact Mara if I don’t respond.”
Mara added the language. Her pen scratched steadily, the sound precise in the quiet room.
The repair cost occupied the next page. Bituin had enough in her account to pay the contractor’s deposit, but only if she did not replenish the equipment fund she had taken from the laundromat after inheriting it. The wash floor had two machines tagged for service and a dryer that rattled when it was full. She had been telling herself she would catch up once the sale money arrived.
There would be no sale money. The buyer’s vacancy condition had made the whole transaction impossible for her to sign. Ellis Kwan’s offer had expired at the annex. His company still held title to the idea of buying the building, but it had not held Bituin to a dishonest declaration. She had the property, the repair, and a thinner account than she had planned for.
“I can pay the deposit now and the balance in two installments,” she said. “The first when the work passes the follow-up test. The second thirty days after that. I won’t promise more than that without a loan.”
“And the reserve?” Mara asked.
“I can set aside a fixed amount each month from the laundromat income. I’ll show the deposit and invoice. If the repair costs exceed the estimate, I’ll bring the new number to the tenants before I authorize extra work, unless it’s an emergency.”
Cora looked at the estimate. “We don’t want the work delayed because we have to agree on every bolt.”
“No,” Bituin said. “Emergency work goes ahead. The limit is for additional non-emergency work. I’ll tell you what it costs.”
They amended the draft. The repair reserve would be held in a separate account, and the contractor’s invoice would be shared with the households. Bituin would contribute to the common costs from the building’s income, but would not bill the tenants for repairs caused by deferred maintenance before the leases. If an unexpected expense made the agreed schedule impossible, she would meet with them and propose a new one rather than quietly add it to rent.